An aging roof may need a planned replacement when leaks recur or the existing assembly is no longer a good candidate for repair. The scope should account for building access and work areas.
Dekoven Roofing plans commercial flat roof replacements around Milwaukee. This page explains how the options are compared and what a replacement proposal should define.
Repair, recovery or replacement
- Repair: suited to localized damage on an otherwise sound roof.
- Recovery: installing a new membrane over an existing roof where the existing assembly is suitable and dry.
- Full replacement: removing the existing roof down to the deck when moisture, age or condition rules out other options.
What a replacement proposal should define
- The roof area covered and the system being installed.
- Insulation, drainage and edge details.
- Staging, roof access and protection of the building and occupants.
- Sequencing and any phasing across the roof.
- Exclusions, such as work by other trades, and how unexpected conditions are handled.
Planning around the building
Replacement work affects tenants, deliveries and parking. Agree on work areas, hours and communication before the project starts.
Frequently asked questions
How do I know if the roof needs full replacement?
Roof age, the extent of wet insulation, repeated leaks and the condition of the membrane all matter. An assessment documents these so you can compare options.
Can the building stay occupied during replacement?
Often yes, with planning. Share occupancy and access details when you request an assessment.
Related pages
Request a commercial roof assessment