What a roofer needs from new construction plans

Dekoven Roofing

November 13, 2026

Useful plans show the roof shape, slopes, penetrations and specified materials. Share the bid deadline and schedule so the roofer can check the scope.

Send the roof plan, relevant sections and the latest revision date with your request. Include the job address, bid deadline and target installation window so the estimator can confirm what information is still needed.

Contact Dekoven Roofing with the current plans and the project schedule to discuss a roofing bid.

Why plans matter

A roofer reading new construction plans looks for roof geometry, slope, specified materials and details at edges, walls and openings. Gaps found early cost far less to fix than gaps found on the roof.

What to share

  • Roof plan and framing plans.
  • Elevations and wall sections.
  • Specified materials and manufacturer requirements.
  • Penetration locations such as vents, chimneys and skylights.
  • Schedule and site access notes.

What to expect back

A written scope that says what is included, what is assumed and what questions remain open. The roofer may also flag conflicts between drawings and the specified system.

Keep plans current

Share revisions promptly so the scope can be updated before materials are ordered.

Frequently asked questions

Can I send plans by email?

Ask the office which file formats they prefer.

What if plans change?

Share revisions promptly so the scope can be updated.

Will the roofer review for errors?

They can flag roofing-related conflicts. Ask what is included.

Related: Ask about a roofing bid

Our Latest articles

Practical roofing guidance for property owners and managers in Milwaukee, southeastern Wisconsin and Houston.

Blog Author Image
Blog Author Image
Dekoven Roofing

November 13, 2026

Blog Author Image
Blog Author Image
Dekoven Roofing

November 13, 2026

Blog Author Image
Blog Author Image
Dekoven Roofing

November 13, 2026