Plumbing vents, equipment curbs and other openings need coordinated locations and details. Last-minute changes can affect both the schedule and roof scope.
Keep a drawing that marks each roof opening and identify which trade confirms the final location. Verify field changes before the roofing detail is built so the work can be coordinated while access is available.
Contact Dekoven Roofing with the current plans and the project schedule to discuss a roofing bid.
Every vent, pipe, chimney, skylight and curb passes through the roof and needs flashing designed for it.
The designer, builder and trades should settle locations before roofing so flashing can be done properly instead of retrofitted. Late changes often mean cutting into finished roofing.
Which penetrations are included in the roofing scope? Who supplies curbs and boots?
Yes, but plan the flashing and ask who is responsible.
Confirm in the scope.
They can be if flashed poorly.
Related: Ask about a roofing bid
Practical roofing guidance for property owners and managers in Milwaukee, southeastern Wisconsin and Houston.